Archive

Open the downloads below to see how our proposal has evolved throughout the period of public consultation.

 

  • 2018 - Introductory Leaflet

    This leaflet provides an introduction to the proposed project

  • 2018 - First draft design

    This map outlines the first draft design of turbine layout for the proposed project

  • 2019 - Community engagement sessions

    Information boards from the three community engagement sessions held in November and December 2018

  • 2018 - Noise Workshop Presentation

  • 2019 - Noise Workshop Q&A

    Main Questions and Answers from the Workshop on Noise

  • 2019 - Engineering Workshop Presentation

  • Design Process & Estimated Timelines

  • 2019 - Engineering Workshop Q&A

    Main Questions and Answers from the Workshop on Engineering

  • 2019 - Information leaflet

    This leaflet provides an update on the proposed project

  • 2019 - Public Information Boards

    Information boards from the two public information sessions held in October 2019

  • 2018 - First & Second draft design

    This map outlines the first & second draft design of turbine layout for the proposed project

  • 2018 - Second Draft Design

    This map outlines the second draft design of turbine layout for the proposed project

  • 2019 - Proposed Site Location

    This map shows the location of the proposed wind farm

  • 2019 - Proposed Site Layout

    This map outlines the proposed turbine layout for the project

  • 2019 - Proposed Buffer Distance

    This map outlines the buffer distance for the proposed turbine layout

  • 2019 - Proposed Grid Route

    This map shows the proposed grid route

  • 2019 - Proposed Transport Route

    This map shows the proposed transport route